Showing posts with label vmware management. Show all posts
Showing posts with label vmware management. Show all posts

Thursday, June 26, 2008

Getting a bit drunk on enterprise dollars.

It's official - Gartner's Thomas Bittman thinks VMware might be drunk.

Denise Dubie has a great article on virtualization management capabilities and a great quote describing the upcoming battle between VMware and Microsoft for the x86 virtualization market, he is quoted as saying:

"The enterprise is going to be very leery of Microsoft, but the on-ramp to VMware is a bit steep for small businesses. VMware doesn't want to lose that potential business, but the company was getting a bit drunk on enterprise dollars," says Thomas Bittman, Gartner vice president and distinguished analyst.

The abundance of enterprise dollars spent on virtualization is because virtualization fixes so many problems, reduces power, reduces physical requirements, makes x86 hardware more efficient, increases uptime, allows resource management at the OS workload level, etc.

One of my favorite reports is one that IDC did in 2006 – it depicted– IT investment to be higher spending in Year 1 on a VMware / virtualization project but that in Year 2 and Year 3 and possibly Year 4 – IT departments would avoid spending on server hardware – you would just fill up the empty capacity of the system you built in 2006.


It looked good on paper, spend more now, avoid spending later.

Unfortunately, multiple issues caused IT departments to run out of capacity, VM sprawl occurred, single core and dual core servers could not hold as many VMs as the equivalent quad core servers.

Often P2V migrations went unchecked, servers have excess CPU capacity but not enough Memory, VMs are consuming too many resources and as a result enterprises are oversizing virtualization projects or not driving up VM density to get the biggest bang from their investment.

Avoid the hangover from “getting a bit drunk” and having to purchase new hardware, more memory, bigger servers, etc. by getting a resource management tool in place and understanding what resources your VMs are using and where you have capacity in virtualized environments.


Monday, June 23, 2008

The Calm Before the Storm

Rakesh Kumar of Gartner published a white paper last fall entitled "U.S. Data Centers: The Calm Before the Storm".

In it he says U.S. Data Centers "are facing considerable disruption during the next three or more years" and they are facing it from a few things:

  • Energy
  • Green IT initiatives
  • Floor space demands
  • New technology

No mention of virtualization unless it's the source of all of the above - impacting energy, trying to be a green IT initiative, trying to help with floor space and it is a new technology.

What should CIOs be going now to prepare for this storm?

  • Consider Data Center Colocation - see who has a data center nearby and see who has fiber to it - you will need 1 GB or 10 GB links depending on the size of your enterprise and hire some good financial people to determine if there is a decent ROI on moving your Data Center to a third party provider.

    Also ask the beancounters to factor in running your own fiber, this may not be as expensive as it once was, carriers may have available strands and you may only have to do the last mile to your location.

  • Worry about your power bill - energy costs have increased, consider off peak times, VMware's introduction of DPM is the ability to power on ESX hosts and then move VMs to take advantage of lower density environments (think your overnight routines that chew up alot of CPU) with DPM you can spread them out to take advantage of lower power costs.

    Before 6 AM and after 6 PM may be lower rates ($$ per kw/hr).

  • Invest in Systems Management tools - get something that helps you identify who is using your resources and driving up your costs. Chargeback by VM will allow you to fairly delivery charges for Data Center usage by the business unit using the most resources.

    This type of transparency will priortize which business unit needs to fix their Data Center problems - be it running highly transactional reports during the day that could be run at night, poorly coded applications that use too much memory, too much CPU, etc.

    Start a list of power supplies in the Data Center - servers, SANs, etc - you will be shocked to see newer servers may have power supplies running at 900-1300 watts - that's nearly 1 KW per hour per server.

Remember its this simple:

Servers = Power A = Heat = Cooling = Power B.

To fix this:

  1. Reducing your physical servers
  2. Reduces your power A
  3. Reduces your heat
  4. Reduces your cooling
  5. Reduces your power B.

Now just get the financial data lined up to show that a server reduction project (i.e. virtualization) may costs some $$ but it be offset by the cost saving of reducing power A and B.

Friday, May 9, 2008

It's all about the ratio.

VKernel is an advocate of running your hardware at high levels of capacity. I know that we would see record-breaking ratios of virtual machines to server hardware.

  • A major worldwide financial services organization achieved a 12:1 consolidation ratio and increased its central processing unit utilization by 30 percent.

  • An Indian petroleum refining and distribution company achieved a 17:1 consolidation ratio and expects to increase that to 30:1 with additional CPUs and RAM.

  • One of Italy's largest banks improved its server utilization rates by 100 percent.

  • A leading US faucet manufacturer saved $250,000 in hardware costs by reallocating existing units instead of purchasing new, achieving a 10:1 consolidation ratio.

  • A South American energy company consolidated its servers by a 20:1 ratio.

  • A federation of trade unions in Singapore consolidated its servers by 46:1, achieving a 26 percent savings.

Smallest is 10:1 and largest is 46:1.

It's all about the ratio.

Thursday, March 6, 2008

Want awesome performance in VMWARE ESX?

Of course! we all do! So let's talk about how to get there. To achieve stellar VMware ESX performance you have to remove ALL bottlenecks in your environment. Remember your performance will only be as fast as the slowest "link" in your performance equation.

Here is the list to start removing performance bottlenecks:

1. Make sure that all of your hosts have sufficient RAM and do not over commit on memory utilization. If your workloads force the host to start swapping memory to disk, kiss your performance goodbye. There is a huge difference in speed between accessing memory internally and doing physical i/o to disk!

2. Make sure your CPU is not over utilized. Checks the processor ready queue to see how long threads are waiting to run. Extended period of time indicates a problem. Also check the overall processor utilization over a week or a month. Keep the overall utilization under 80%

3. As you scale up your ESX environment you will run into disk i/o bottlenecks. Make sure that you places your most mission critical VMs on the fastest storage available to you

4. Understand the timing of your workloads to identify when or if constraints develop in memory utilization, cpu, and disk i/o. Spread out the workloads by changing when they run i.e timing or move workloads to different hosts to mix it up.

Friday, February 29, 2008

How to predict future capacity bottlenecks


Your virtual data center is growing. You are adding a ton of new VMs every week. Wouldn't it be really cool if you head a "crystal ball" that told you in how many days you will run into capacity bottlenecks and what type of bottlenecks it will be (cpu, memory, storage) ?

Now you can. Join Vkernel's beta program for Capacity Bottleneck Analyzer that will kick off in early March